嫩BBB搡BBB搡BBB四川_CHINESE国产人妖TS_少妇久久久久久被弄到高潮_亚洲色大成网站WWW永久网站_爱做久久久久久_深夜放纵内射少妇_欧美牲交a欧美牲交aⅴ图片_国精产品一二二线_国产亚洲人成网站在线观看琪琪秋_

Service hotline:

0315-5913666

+86-18931500255

Domestic > Zaozhuang Mining Group Chaili Coal Preparation Plant Renovation and Expansion Project
18棗莊礦業(yè)集團(tuán)柴里礦選煤廠改擴(kuò)建工程.jpg
  • 18棗莊礦業(yè)集團(tuán)柴里礦選煤廠改擴(kuò)建工程.jpg

Zaozhuang Mining Group Chaili Coal Preparation Plant Renovation and Expansion Project

Type: Coking coal preparation plant

Scale: 2.40Mt/a

Contracting mode: design+partial equipment supply, renovation project

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by a flotation machine, and the flotation clean coal is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The tail coal slurry water is concentrated in the thickener and then dehydrated and recovered by a filter press. The washing water is circulated in a closed circuit, which is environmentally friendly and energy-saving.